GC Logo
 Bypass Oberau

Bypass Oberau

Traffic relief for the town center

At a glance

Client
Community Oberau
Country
Germany

When traffic is overloaded…

The community and especially the center of Oberau has been suffering from the high traffic load from the federal highways B23 and B2 for decades. A bypass should provide relief.

A bypass is currently under construction, which will guide traffic on the B2 underground under the town center. However, there is still no traffic concept to relieve the town from traffic on the B23 federal highway.

…a solution has to be found

For this reason, Geoconsult was assigned with the preparation of two independent studies. The first study is a comparison of different variants and the optimization of the best variant. The existing route variants for a possible connection between the B23 and the B1 bypass should be analyzed and evaluated independently. The second study envisages an examination of the project area in order to find a new route. As in Study 1, the new route variants are compared with one another and evaluated.

Services in a nutshell

  • Creation of variant studies
  • Geotechnical calculations – Numerical simulations
  • Alignment