The city of Buenos Aires has suffered severe floods in at least 12 occasions between 1985 and 2001, all of them with heavy losses, including human lives. Thus, the city has developed its own Hydraulic Master Plan, including the second relief outfall for the 17 km2 basin of the Vega Stream.
GC GROUP’s role
The contract included monitoring during construction with instrumentation measurements follow-up and permanent advice based on the values observed in the TBM operating parameters.
The consortium in charge of construction, Cartellone – Roggio – Supercemento JV, commissioned GC GROUP for the development of the detailed design and monitoring during construction of the main tunnel and all the complementary works for the 8.4 km long water drainage project.
Our Services
Our Services
More Projects
:format(jpeg):quality(80)/f/323306/2500x1045/5bcb2ca06e/nature-technology.jpg)
WE UNITE
NATURE AND
TECHNOLOGY
GEOCONSULT stands for sustainable action, combining innovative engineering with ecological goals. Our commitment is guided by the 17 United Nations Sustainable Development Goals and is reflected in all areas of our work.