Entry tubes into the Klaus tunnel chain

Full extension Klaus Tunnel chain

A9 Phyrn motorway, Austria

Customer(s)
ASFINAG
Country
Austria

The Klaus tunnel chain along the A9 Phyrn motorway was built in 1996 in the first construction phase. In the second construction phase, the 4 tunnels were extended by a second tube and the 6 bridge structures were renovated.

The Klaus tunnel chain passes along the Upper Austrian A9 Pyhrn motorway starting at Klaus, continuing along the Klaus reservoir at the foot of the Limestone Alps and finally ends at Dirnbach. The chain of tunnels was initially built in 1996, and in the second construction phase, beginning in 2013, it was fully expanded. This chain of tunnels consists of 4 tunnels and 6 bridge structures, which were renovated on the one hand and newly built on the other.

Our Services

Your contact person

at GeoConsult

DI Anton Kaltenböck

CTO & Head of Business Development

More Projects

A digital hand holds a plant in a square frame, surrounded by a radiant blue background.

WE UNITE

NATURE AND

TECHNOLOGY

GEOCONSULT stands for sustainable action, combining innovative engineering with ecological goals. Our commitment is guided by the 17 United Nations Sustainable Development Goals and is reflected in all areas of our work.