:format(jpeg):quality(80)/f/323306/1615x650/2fbe13ca43/bosrucktunnell.jpg)
Bosrucktunnel full extension and general renovation of the eastern tunnel tube
A9 Phyrn motorway
- Customer(s)
- ASFINAG
- Country
- Austria
In 1983 the first tube of the Bosruck Tunnel was opened to traffic. This was completely refurbished in the course of the full expansion with the addition of a second tunnel tube.
Construction of the Bosruck Tunnel
Within six years, the western tunnel tube of the Bosruck tunnel was rebuilt with all additional relevant construction measures such as the construction of cross passages, conversion of the portal buildings, construction of galleries and work on the architectural design of the portal buildings.
From old to new
The existing tunnel was also completely refurbished during this period. The renovation included on the one hand the removal, disposal and restoration of the inner shell in the area of the pressurized mountains and on the other hand the connection of the newly built cross passages in the existing tunnel tube, the complete renewal of the roadway (substructure, superstructure and concrete roadway), upgrading of the intermediate ceiling and the Drainage system and expansion of the fire-fighting water pipeline.
In both cases, the entire electrotechnical equipment was implemented, refurbished or expanded.
Our Services
Our Services
Construction Management
- Geological documentation
- Supervision of the proper and professional implementation of all work to be carried out according to the recognized rules of engineering
- Supervision of the work on site (construction, planning and services)
- Veranlassung und Überwachung von Eignungs-, Qualitäts- und Abnahmeprüfungen
- Ongoing observation and (geological) assessment of the rock behavior as well as the tunnel construction interpretation of the geotechnical measurements as the basis for tunneling
- Initiation and monitoring of suitability, quality and acceptance tests in accordance with the relevant technical regulations
- Control schedule: create, update, coordinate (construction time, schedule control, time planning)
Your contact person
at GeoConsult
Your contact person
at GeoConsult
DI Anton Kaltenböck
CTO & Head of Business Development
More Projects
:format(jpeg):quality(80)/f/323306/2500x1045/5bcb2ca06e/nature-technology.jpg)
WE UNITE
NATURE AND
TECHNOLOGY
GEOCONSULT stands for sustainable action, combining innovative engineering with ecological goals. Our commitment is guided by the 17 United Nations Sustainable Development Goals and is reflected in all areas of our work.