Environmental Impact Declarations and Assessments
Reliable evaluations to ensure the ecological and legal compatibility of your project
- Customer(s)
- Windsfeld AG,
TINETZ,
VERBUND,
Salzburg AG - Country
- Austria
Realized projects: Windsfeld wind farm, Ötztal 110 kV line, Golling hydroelectric power plant
Environmental impact declarations and assessments are a key instrument for identifying and evaluating the potential impact of planned projects on the environment at an early stage, minimizing interference with nature and promoting the sustainable development of infrastructure and construction projects.
Services – Natural Hazards Division
While the field of natural hazards does not constitute a protected asset in the strict sense of the Environmental Impact Assessment Act (UVP-Gesetz), it can nevertheless provide essential input for route alignment and site selection of project components. Early integration into project planning allows for the identification of potential hazard zones and the development of optimized solutions for routes and site locations.
Natural Hazard Maps as a Basis for Planning
As early as the initial planning phases, we prepare natural hazard indication maps (current status) that clearly highlight risk areas. These maps support the selection of potential locations and route sections in a way that minimizes risks and ensures compliance with safety requirements.
Assessment of Construction and Operational Phases
The effects of natural hazard processes are analyzed separately for the construction and operational phases. If, despite optimized planning, risks remain for route sections or site locations, we carry out detailed hazard analyses.
Following a thorough site inspection, we use advanced 2D and 3D process simulations to model the relevant types of natural hazard processes – such as rockfall, avalanches, landslides, debris flows, or flooding.
In addition to protecting infrastructure, a key focus is placed on ensuring the safety of individuals – both during construction and during maintenance and servicing activities in the operational phase.
Risk Mitigation Measures
Based on the results of the hazard analysis, we develop tailored proposals for risk mitigation. These include structural or organizational solutions according to the TOP principle (technical, organizational, and personal protective measures), covering all phases of the project and ensuring safety at affected sites and along route sections.
Our Services
Our Services
Vision & Visualization
- Generation of high-resolution terrain models and orthophotos
- 2D and 3D process modeling of the predominant natural hazard type
Planning & Consulting
- Development of organizational and technical mitigation measures in accordance with ONR standards and Eurocode 7 (EC7)
- Cost-benefit analysis of proposed measures
- Preparation of technical report in accordance with UVP-G-2000
Construction Management
- On-site operations supported by state-of-the-art drone technology and rope-access techniques
Your contact person
at GeoConsult
Your contact person
at GeoConsult
Mag. Andreas Schober
Head of Natural Hazards and Risk Management
:format(jpeg):quality(80)/f/323306/1388x1160/f015b3d54b/nghp_bericht_karte.jpg)
:quality(80)/f/323306/1920x1439/45ea308e8e/uve-uvp-gebirge.jpg)
More Projects
:format(jpeg):quality(80)/f/323306/2500x1045/5bcb2ca06e/nature-technology.jpg)
WE UNITE
NATURE AND
TECHNOLOGY
GEOCONSULT stands for sustainable action, combining innovative engineering with ecological goals. Our commitment is guided by the 17 United Nations Sustainable Development Goals and is reflected in all areas of our work.